Info Availability for CTE and CTO

Building Plan Approval / Consent to Establish

 

  1.     Standard Operating procedure for  Building_Plan_Approval_Residential
  2.     Standard Operating procedure for Building_Plan_Approval_ Non Residential
  3.     Standard Operating procedure for  Compounding_Multi_Dwelling
  4.     Standard Operating procedure for   Compounding_Single_Dwelling
  5.     Standard Operating procedure for   Land_Use
  6.     Comprehensive list of documents to be submitted as part of the application for Building Plan Approval / Consent to Establish

        7.   Detail procedure of Inspection for CTE

        8.   Joint Inspection Checklist for CTE

        9.   Timeline for various verification stages of a map

       10.  Random Allocation of Inspectors at the time of CTE

 

Occupancy Certificate / Consent to Operate

  1.  Comprehensive list of documents to be submitted as part of the application for Occupancy Certificate / Consent to Operate

      2.           Detail procedure of Inspection for CTO

      3.           Joint Inspection Checklist for CTO

     4.            Timeline for various verification stages of a map for CTO

     5.            Random Allocation of Inspectors at the time of CTO

 

Mussoorie Dehradun Development Authority © 2016